The crew installed the piping for the French drain and constructed the concrete forms yesterday. Sorry for the crappy photos. I forgot to take some when I got home last night, so I snapped them with a flash while it was still dark this morning before the crew arrived.
 |
Future concrete patio. |
 |
Future concrete patio. |
 |
French drain. Those bars you see sticking up will be a poured concrete bench to hide the drain and provide additional seating along that side of the pool. |
No comments:
Post a Comment